型號: | - |
---|---|
品牌: | 上研牌 |
原產地: | 中國 |
類別: | 電子、電力 / 其它電力、電子 |
標籤︰ | 床控板 , 酒店床控板 , 微電腦床控 |
單價: |
-
|
最少訂量: | - |
即時通訊: | 最後上線︰2013/02/25 |
酒店客房IC卡智能節電取電開關The guest room IC card intelligence stanza electricity in hotel takes to
酒店客房IC卡智電節能取電開關酒店客房IC卡、感應卡智能節電取電開關是我公司專為酒店賓館而設計的酒店客房智能節能取電開關。它采客房的開門卡進行取電和去電,以致客人離開客房既將客房的電關掉,節約電能。<一> 功能:靜態時:指示燈亮無負載輸出。動態時:指示燈熄滅有負載輸出(即1、插入卡指示燈熄滅,有負載輸出;拔出卡后經5-10秒延時指示燈亮,無負載輸出。)<二> 性能:1、額定工作電壓:U=AC200V 2、靜態工作電流:IS<10mA 3、靜態功耗:Ps<40Mw 4、動態工作電流:ID<20mA 5、動態功耗PD<0.5W 6、最大工作負載電流:IR=30A 7、規格:A、外觀尺寸:85×85×39mm B、整機重量:G=100g <三> 檢測:按操做指導書接好線,檢查無誤后通電。通電后,指示燈亮,負載斷電。插入使用卡,指示燈熄滅,則負載通電。拔出使用卡,經5-10秒的延時指示燈亮,負載斷電。經過上述的插卡――工作-拔卡――延時關閉為一個工作週期。若上述工作正 確,則本產品的功能是完全可靠的,到此測試完畢。<四> 安裝步驟:1.將節電開關面板與底板掰開。2.連接電源和負載;電源火線、零線分別接在節電開關標有IN的兩個接線柱上,負載的火線,零線分別接在節電開關標有OUT的兩個接線柱上。3.用兩個螺釘將開關底板固定在標準電源開關盒上。4.將節電開關面板與開關底板扣位對齊,適當加壓,使開關面板與開關底扣緊。警告:請確認電源接線無誤后才能通電。火線輸入火線輸入零線輸出零線輸出此示圖為元件層的主視圖
The guest room IC card intelligence stanza electricity in hotel takes to give or get an electric shock a switch
The guest room IC card in hotel Zhi electricity economy energy's taking to give or get an electric shock guest room IC card in switch hotel and responding the card intelligence stanza electricity to take to give or get an electric shock a switch is just for my company the guest room intelligence economy energy in hotel of guest house in the hotel but design to take to give or get an electric shock a switch.It adopts opening the door of guest room the card carry on taking an electricity and give or get an electric shock, with the result that the guest leaves guest room since turn off the electricity of guest room, economize electric power.<1> function:Static state:The indicator is bright to have no load to output.Dynamic state:The indicator puts out load exportation(namely 1, insert a card indicator to put out, have a load to output;The indicator is bright, has no load to output while postponing through 5-10 after pulling out card.)<2> function:1, the sum settle work electric voltage:U=AC200 V 2, the static state work electric current:IS<10 mas 3, the static state achievement consume:Ps<40 Mws 4, the dynamic state work electric current:ID<20 mas 5, the dynamic state achievement consume PD<0.5 Ws 6, the biggest work load electric current:IR=30 As 7, specification:AN and external appearance size:85 ×s 85 the ×s 39 mm B and the whole machine weight:G=100 gs<3> examine:Press to hold to guide a book to connect good line, check without any error behind switch on electricity.After switching on electricity, the indicator is bright, load a power failure.Insert to use card, the indicator puts out, the load then switches on electricity.Pull out to use card, the indicator is bright, load a power failure while postponing through 5-10.Has been above-mentionedly put card ―― work-pull out card ― the ― postpone close is a work period.If is above-mentioned to work just and indeed, the function of this product then is completely dependable, arrive this test to complete.<4> installation steps:1.Give or get an electric shock stanza switch front-panel and scaleboard bye open.2.Link the power and load;The power front line, zero lines connect on the stanza to give or get an electric shock 2 that the switch mark has IN to connect line pillar respectively up, the front line of load, zero lines connect on the stanza to give or get an electric shock 2 that the switch mark has OUT to connect line pillar respectively up.3.Use two bolts switch scaleboard fixedly on the standard power switch box.4.Give or get an electric shock stanza switch front-panel and switch scaleboard to button up to align, add to press appropriately and make switch front-panel and switch bottom tie tight.Warn:Please confirm the power to connect line without any error just can switch on electricity behind.The front line importation front line inputs zero lines to output zero lines to output this lord that shows the diagram as component layer to see diagram