首頁 > 產品信息 > 工業設備 > 礦業設備

大壩帷幕固結灌漿塞 1大壩帷幕固結灌漿塞 2大壩帷幕固結灌漿塞 3大壩帷幕固結灌漿塞 4大壩帷幕固結灌漿塞 5
  • 大壩帷幕固結灌漿塞 1
  • 大壩帷幕固結灌漿塞 2
  • 大壩帷幕固結灌漿塞 3
  • 大壩帷幕固結灌漿塞 4
  • 大壩帷幕固結灌漿塞 5

大壩帷幕固結灌漿塞

型號:40-200mm
品牌:BIAOHUI
原產地:中國
類別:工業設備 / 礦業設備
標籤︰注漿封孔器 , 灌漿塞 , 充氣封隔器
單價: -
最少訂量:1 件
發送查詢 添加到查詢籃

會員信息

詳細信息

河北標匯橡塑制品有限公司

免費會員河北省衡水市
即時通訊:最後上線︰2023/01/09

產品描述

Product Description

1、 Product introduction

Use 1. Coal body water injection, dust reduction, coal pressure reduction, coal splitting, gas discharge, etc. 2. Grouting, water injection and hole pl ing of coal or rock mass. 3. It is used for curtain, consolidation, backfilling, chemical grouting and cement grouting of hydropower stations and reservoirs. 4. Water pressure test for geological exploration and water pl ing for drilling.

2、 Using

1. Connect all pipeline systems, tighten all screw threads, connect the air source (or hydraulic pump), place the grouting plug at the orifice (or in a closed steel pipe at one end) for pressure test, check whether the joint leaks, and put it into the hole for standby.

2. Open the pressure reducing valve of the gas cylinder or the water pressure pump to allow the grouting plug to expand slowly. Note that the inflation pressure must be greater than 2/3 of the grouting pressure. Grouting can be started when the predetermined pressure is reached.

3. At the beginning of grouting, when there is a large amount of grout coming out of the grout return port, slowly pressurize it to the predetermined grouting pressure by several times, otherwise it is easy to form a large differential pressure. During grouting, the pressure on the pressure gauge of the pressure reducing valve of the gas cylinder shall be checked frequently. If it is reduced, it shall be supplemented immediately.

4. When the grouting time is long, it is necessary to check whether there is grout channeling, blocking and returning. If there is, stop grouting, release the pressure, and loosen the air plug up and down to prevent it from being consolidated and difficult to take out.

5. At the end of grouting, the grouting pressure must be released first, and then the inflation pressure must be released. Do not release the inflation pressure first to prevent the grouting plug from shooting out and causing safety accidents.

6. After grouting, just put the grouting plug into the closed steel pipe at one end, inflate about 0.5Mpa, and then conduct cyclic flushing.

7. After the grout plug is taken out, connect the water pipe with the grout inlet pipe and the grout return pipe for flushing.

8. When multiple holes are grouted together, all pipelines must be arranged in parallel and shall not be twisted together to prevent accidents in one hole from affecting the safety of other holes.

9. After a long time of use, the lower end of the grouting plug shall be disassembled for cleaning and greased.

10. When long cracks or relatively broken are found during drilling, grout channeling, pl ing and grout return may occur, and another air pipe shall be put to the upper end of the grouting plug. If grout channeling, pl ing and grout return occur, high pressure air shall be used to flush it to prevent jamming.

3、 Main technical parameters:

Sealing hole diameter 30-2000mm (can be processed according to user requirements)

Working pressure 1-8MPa (can be processed according to user requirements)

Working flow: 3-4.5 tons per hour

Hole sealing depth 1-8000m

SIZE I.D(mm) O.D(mm) Expansion Range(mm) Aperture(mm) W.P(Mpa) T.P(Mpa) B.P(Mpa)
φ16-2 16±0.5 30±1.5 50  +8/-2 40 8 16 32
φ16-4 16±0.5 36±1.5 50  +8/-2 40 20 30 40
φ19-2 19±0.5 36±1.5 60  +8/-2 45 8 16 32
φ19-4 19±0.5 40±2.0 60  +8/-2 45 20 30 40
Φ22-2 22±0.5 39±2.0 80  +8/-4 50 6 12 24
Φ22-4 22±0.5 45±2.0 80  +8/-4 50 20 30 40
Φ25-2 25±0.5 42±2.0 90  +8/-4 65 6 12 24
Φ25-4 25±0.5 48±2.0 85  +8/-4 55 16 24 32
Φ32-2 32±0.5 50±2.0 90  +8/-4 60 6 12 24
Φ32-4 32±0.5 54±2.0 90  +8/-4 60 16 24 32
Φ38-2 38±0.5 55±2.0 95  +8/-4 65 5 10 20
Φ38-4 38±0.5 60±2.0 95  +8/-4 65 16 24 32
Φ45-2 45±0.5 63±2.0 100  +8/-4 75 4 8 16
Φ45-4 45±0.5 69±2.0 100  +8/-4 75 16 24 32
Φ51-2 51±0.5 69±2.0 110  +8/-4 90 4 8 16
Φ51-4 51±0.5 75±2.0 110  +8/-4 90 16 24 32
Φ64-2 64±0.5 84±2.0 120  +8/-4 100 3 6 12
Φ64-4 64±0.5 90±2.0 120  +8/-4 100 8 12 16
Φ76-2 76±0.5 94±2.0 130  +8/-5 110 3 6 12
Φ76-4 76±0.5 99±2.0 130  +8/-5 110 8 12 16
Φ89-2 89±0.5 109±2.0 140  +8/-5 130 3 6 12
Φ102-2 102±0.5 122±2.0 160  +8/-5 150 3 6 12
 


產品圖片

大壩帷幕固結灌漿塞 1
圖 1
大壩帷幕固結灌漿塞 2
圖 2
大壩帷幕固結灌漿塞 3
圖 3
大壩帷幕固結灌漿塞 4
圖 4
大壩帷幕固結灌漿塞 5
圖 5

向該會員發送查詢

河北標匯橡塑制品有限公司

景縣杜橋鎮常莊工業園X96

電話︰
086-0318-4363388
傳真︰
聯繫人︰
劉聰 (經理)
手機︰
15075803959
免責聲明:以上信息由企業自行提供,內容的真實性和合法性由發布企業負責。「自助貿易」對此不承擔任何保証責任。
舉報投訴:如發現違法和不良資訊,請 點此處舉報

中國供應商快速搜索︰

"礦業設備" 產品信息

"礦業設備" 供應商